Project Details:

Downpatrick WwTW

Power Control & Automation

Design, supply, delivery & installation of a MCC and electrical installation works for a wastewater treatment plant. Work generally consisted of:

Main Works MCC

  • Manufacture of form 4 type3 motor control centre
  • 1600Amp mains generator incomer with auto changeover & G59 synchronising
  • 30 No Siemens Simicode DOL and S/D Intelligent starters
  • 24 No ABB VSD’s starters on a profibus network.
  • Installation and commissioning of power factor correction equipment
  • Control & instrumentation
  • Harmonic Survey

Storm Tanks MCC

  • Manufacture of form 4 type3 motor control centre with
  • 100Amp mains income
  • 4 No Siemens Simicode DOL and S/D Intelligent starters and
  • 2 No ABB VSD’s starters on a profibus network.
  • Control & instrumentation

Russell Park MCC

  • Manufacture of form 4 type3 motor control centre with
  • 630Amp mains generator incomer with manual changeover
  • 3 No ABB VSD’s hardwired starters
  • Hardwired control & instrumentation

Project Details

  • Client:
    MWH Treatment
  • Completion Date:
    2008